favorite

Sector Policy Support Programme Coordination, Including Support to the Agriculture and Justice Reform Support Programme (ARSP and JRSP)

Assist the Ministry of Economy Development (MED) with administering and implementing all Sector Policy Support Programmes (SPSP) Conduct annual reviews of the achievements of the Public Financial Management (PFM) against the agreed indicators and conditions Design and implement a performance evaluation and monitoring system to help the MED compile regular reports on the achievements of […]

Sector Policy Support Programme Coordination, Including Support to the Agriculture and Justice Reform Support Programme (ARSP and JRSP) Read More »

Financial Industry – Capacity Development of the State Commission for Securities of Azerbaijan – Capital Markets Modernisation Project

Review corporate and individual taxation laws and propose amendments to create an enabling environment to promote the development of SMEs Establish a single depository centre, introduce a coding structure, streamline processes, and implement a Capital Market Information System Review the state schemes for financial support to SMEs and entrepreneurs and recommend financing methods through the

Financial Industry – Capacity Development of the State Commission for Securities of Azerbaijan – Capital Markets Modernisation Project Read More »

Technical Assistance Project for the Implementation of the Pilot Regional Development Programme (PRDP) in the Republic of Azerbaijan

q Develop the capacity of the Ministry of Economy and Industry (MEI) in regional development planning and implementationq Prepare a Pilot Regional Development Plan and undertake market analysis to identify specific business opportunities in the pilot regionq Undertake feasibility studies and cost-benefit analysis for investing in support infrastructureq Prepare tailored specific promotion material and actions

Technical Assistance Project for the Implementation of the Pilot Regional Development Programme (PRDP) in the Republic of Azerbaijan Read More »

Infrastructure Regulation and Tariff Policy Development – Stage 2 – Implementation for Water Pilot Project

Document efficiency, reliability, and quality performance of the pilot company Introduce and promote RAB and WACC methodologies in tariff setting Determine costs and implement a new costing and planning method Design activity-based costing methodology and assist in its implementation Prepare guidelines for investment planning and approval procedures Calculate tariffs based on investment program and using

Infrastructure Regulation and Tariff Policy Development – Stage 2 – Implementation for Water Pilot Project Read More »

Bukhara and Samarkand Sewerage Project: Services for Engineering Design, Bidding Documents, Construction Supervision and Start-up Assistance

Component A – Preliminary Design: Prepare preliminary designs for the reconstruction and extension of the sewerage network, wastewater pumping stations, wastewater treatment plants, and operations and maintenance equipment, as well as prepare detailed costing information and a procurement plan for each city Component B – Detailed Designs and Bidding Documents: Draft detailed designs and bidding

Bukhara and Samarkand Sewerage Project: Services for Engineering Design, Bidding Documents, Construction Supervision and Start-up Assistance Read More »

Aktobe Water Project: Corporate Development Programme

Conduct an analysis of the financial and operational performance of the company Revise the organisational structure and prepare job descriptions Prepare a Financial and Operational Performance Improvement Programme (FOPIP) Improve tariff setting, increase revenue collection, and reduce non-revenue water Support the implementation of FOPIP and conduct training events Introduce technologies for preparing water balances and

Aktobe Water Project: Corporate Development Programme Read More »

Khujand Wastewater Project: Phase III – Corporate Development, Stakeholder Participation and City Support Programmes

Assist the company to further improve its financial and operational performance Improve tariff setting, increase revenue collection, and reduce non-revenue water Impove the organisational structure and human resources management function Prepare a Financial and Operational Performance Improvement Programme (FOPIP) Improve tariff setting, increase revenue collection, and reduce non-revenue water Support the implementation of FOPIP and

Khujand Wastewater Project: Phase III – Corporate Development, Stakeholder Participation and City Support Programmes Read More »

Corporate Development and City Support Programmes for the City of Bishkek and Its Water Company

Conduct an analysis of the financial and operational performance of the company Revise the organisational structure and prepare job descriptions Prepare a Financial and Operational Performance Improvement Programme (FOPIP) Improve tariff setting, increase revenue collection, and reduce non-revenue water Support the implementation of FOPIP and conduct training events Assist in preparing IFRS financial statements and

Corporate Development and City Support Programmes for the City of Bishkek and Its Water Company Read More »

Aktau Waste Management Project – Corporate Development Programme

Help sign a Public Service Contract (PSC) between the City and the Company Prepare PSCs with the waste collection and transportation companies Implement a Financial and Operational Performance Improvement Programme Develop and adopt a five-year Corporate Business Plan Introduce modern Management Information System Develop a landfill gate fee calculation methodology Introduce financial reporting procedures in

Aktau Waste Management Project – Corporate Development Programme Read More »

Ust-Kamenogorsk Solid Waste Management (SWM) – Capacity Building and Corporate Development

Revise SWM legislation to establish effective financial, operational and environmental management, and clearly outline the roles of each stakeholder Enhance tendering and contractual arrangements for waste collection and transportation, and introduce service contracts based on quality incentives Develop a new cost recovery Landfill Gate Fee setting methodology based on a charge levied upon the weight

Ust-Kamenogorsk Solid Waste Management (SWM) – Capacity Building and Corporate Development Read More »